Indoor and Built Environment

 

Advanced Search

Journal Navigation

Journal Home

Subscriptions

Archive

Contact Us

Table of Contents

Register here to gain access to SAGE's 500+ Journals Online

Sign In to gain access to subscriptions and/or personal tools.
This Article
Right arrow Full Text (PDF)
Right arrow References
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Similar articles in ISI Web of Science
Right arrow Alert me to new issues of the journal
Right arrow Add to Saved Citations
Right arrow Download to citation manager
Right arrowRequest Permissions
Right arrow Request Reprints
Right arrow Add to My Marked Citations
Citing Articles
Right arrow Citing Articles via ISI Web of Science (5)
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Quezada, N.V.
Right arrow Articles by Lange, J.H.
Right arrow Search for Related Content
Social Bookmarking
 Add to CiteULike   Add to Connotea   Add to Del.icio.us   Add to Digg   Add to Reddit   Add to Technorati  
What's this?
Indoor and Built Environment, Vol. 13, No. 3, 199-203 (2004)
DOI: 10.1177/1420326X04044208

Final Clearance Criteria After Mould Remediation

N.V. Quezada

ADS Consulting, Las Vegas, USA

J.H. Lange

Envirosafe Training and Consultants, Pittsburgh, USA john.pam.lange{at}worldnet.att.net

Final clearance sampling practices for mould abatement projects have not been evaluated. This paper proposes procedures to remedy this. It is suggested that following remediation and after the visual inspection at least five to seven air samples should be collected. These sampling practices can also be used to screen for mould problems as part of a visual inspection and to assist in recognizing a problem dwelling. It is suggested that screening should involve taking at least four samples. To determine if the air concentration of mould is elevated it is necessary to sample inside and outside the building (abatement area). Since these samples have been shown to be non-normal in distribution, transformation is required or non-parametric statistic testing must be performed to determine whether the airborne mould concentration is elevated inside the area of interest (the building).

Key Words: Mould final clearance • Abatement • Remediation • Sampling


Add to CiteULike CiteULike   Add to Connotea Connotea   Add to Del.icio.us Del.icio.us   Add to Digg Digg   Add to Reddit Reddit   Add to Technorati Technorati    What's this?